Learn and Practice Free Time and Work Set 3 questions
Click below to Practice Free Time and Work Set 3 Questions
You can get answer of the below sample questions by going through the above Question sets.
A does a work in 10 days and B does the same work in 15 days. In how many days they together will do the same work ?
Option 1: 4 Days
Option 2: 5 Days
Option 3: 6 Days
Option 4: 7 Days
Option 5:
If 40 people can make 60 toys in 8 hrs, if 8 people leave the work, how many toys can make in 12 hrs ?
Option 1: 48 Toys
Option 2: 72 Toys
Option 3: 96 Toys
Option 4: 24 Toys
Option 5:
If 3 men or 4 women can do a work in 43 days, how long will 7 men and 5 women take to comlete the work ?
Option 1: 8 Days
Option 2: 9 Days
Option 3: 10 Days
Option 4: 12 Days
Option 5:
A man, a women and a boy can complete a job in 3, 4 and 12 days respectively. How many boys must assist 1 man and 1 woman to complete the job in 1/4 of a day ?
Option 1: 31
Option 2: 41
Option 3: 40
Option 4: 43
Option 5:
A man on tour travels first 180 km at 60 km / hr and next 180 km at speed of 80 km / hr . The average speed of first 360 km of the tour is :
Option 1: 78.57 Km/Hr
Option 2: 68.57 Km/Hr
Option 3: 58.57 Km/Hr
Option 4: 48.57 Km/Hr
Option 5:
A train running at 3 / 7 of its own speed reached the destination in 14 hours, how much time could be saved if the train would have run at its own speed ?
Option 1: 1 Hr
Option 2: 2 Hr
Option 3: 3 Hr
Option 4: 4 Hr
Option 5:
12 men can complete a work in 18 days. Six days after they started working, 4 men joined them. How many days will all of them take to finish the remaining work?
Option 1: 9
Option 2: 12
Option 3: 10
Option 4: 15
Option 5:
A train travells at average speed of 100 km / hr, it stops for 3 mins after travelling 75 kms of diatance. How long it takes to reach 600 kms from the starting point.
Option 1: 6 Hrs 21 Mins
Option 2: 7 Hrs 21 Mins
Option 3: 8 Hrs 21 Mins
Option 4: 9 Hrs 21 Mins
Option 5:
A is faster than B . A and B each walk 24 km. The sum of their speeds is 7 km / hr and the sum of their time taken is 14 hrs. Then As speed is equal to :
Option 1: 1 Km/Hr
Option 2: 2 Km/Hr
Option 3: 3 Km/Hr
Option 4: 4 Km/Hr
Option 5:
Speed ratio of two school buses A and B in covering a certain distance is 4 : 5, If A takes 30 minutes more than B covering the distance, then time taken by B to reach the destination is :
Option 1: 1 Hr
Option 2: 2 Hr
Option 3: 3 Hr
Option 4: 4 Hr
Option 5:
Seven men can complete a work in 12 days. They started the work and after 5 days, two men left. In how many days will the work be completed by the remaning men ?
Option 1: 9(4/5) Days
Option 2: 10(4/5) Days
Option 3: 7(4/5) Days
Option 4: 9(3/5) Days
Option 5:
10 men and 15 women together can complete a work in 6 days. It takes 100 days for one man alone to complete the same work.How many days will be required for one woman alone to complete the same work ?
Option 1: 225
Option 2: 230
Option 3: 235
Option 4: 240
Option 5:
If 6 men and 8 boys can do a piece of work in 10 days while 26 men and 48 boys can do the same in 2 days, the time taken by 15 men and 20 boys in doing the same type of work will be :
Option 1: 2
Option 2: 4
Option 3: 6
Option 4: 8
Option 5:
Practice Free Time and Work Set 3 Questions online
By Practicing the below question set :
The student will get the basic and advanced knowledge on Time and Work Set 3.
The student will learned the priciples and methedology of Time and Work Set 3.
The student will evaluate the knowledge level on Time and Work Set 3.
Student can practice number of times the question till he is clear.
Student can provide the review / feedback / suggestion on the questions which will help to others.
The question contains the simple to complex level difficulties so that student can improve the knowledge.
Kindly
Note : The information provided here is just indicative
information and is provided on “as is”
and “as available” basis . We make no
claims on accuracy and reliability of the information.
For correct/current information kindly contact concerned
college/institution/authorities