Learn and Practice Free Quality Management Set 1 questions
Click below to Practice Free Quality Management Set 1 Questions
You can get answer of the below sample questions by going through the above Question sets.
What is the difference between scope verification and quality control?
Option 1: There is no difference.
Option 2: Scope verification is primarily concerned with the correctness of work results while quality control is primarily concerned with the acceptance of work results.
Option 3: Scope verification is concerned with ensuring that changes are beneficial while quality control is concerned that the overall work results are correct.
Option 4: Scope verification is primarily concerned with the acceptance of work results while quality control is primarily concerned with the correctness of work results.
Option 5:
A new testing center is going to be constructed over the next two years. The project sponsor and project manager have been identified and high-level estimates begun. It is expected that the project can be completed within budget and on schedule. The only difficulty is in acquiring the number of resources with the correct expertise to complete the work. Under these circumstances, the project manager should spend more time creating a:
Option 1: risk analysis.
Option 2: responsibility assignment matrix.
Option 3: responsibility chart.
Option 4: resource-limited schedule.
Option 5:
_____________ identifies which quality standards are relevant to the project and determines how to satisfy them.
Option 1: Quality planning
Option 2: Quality assurance
Option 3: Quality control
Option 4: Process control
Option 5: Total Quality Management
_____________ monitors specific project results to determine if they comply with relevant quality standards and identifies ways to eliminate causes of unsatisfactory performance.
Option 1: Quality planning
Option 2: Quality assurance
Option 3: Quality control
Option 4: Process control
Option 5: Total Quality Management
The project management team must be careful not to confuse quality with grade. Grade is:
Option 1: A system to measure operational planning techniques
Option 2: A category for quality improvement
Option 3: A rank given to entities having the same functional use but different requirements for quality
Option 4: A check list for quality management techniques
Option 5: A report from quality audits
__________ definition describes, in very specific terms, what something is, and how it is measured by the quality control process.
Option 1: Operational
Option 2: Process control
Option 3: Quality policy
Option 4: Hierarchical system model
Option 5: Product
The quality management processes do not include:
Option 1: Quality planning
Option 2: Quality assurance
Option 3: Quality control
Option 4: Overall change control
Option 5: None of the above
_____________ evaluates overall project performance on a regular basis to provide confidence that the project will satisfy the relevant quality standards.
Option 1: Quality planning
Option 2: Quality assurance
Option 3: Quality control
Option 4: Process control
Option 5: Total Quality Management
Project quality management must address both the _____________ of the project, and the _____________ of the project.
Option 1: Quality, schedule
Option 2: Objectives, organization
Option 3: Management, product
Option 4: Customer requirements stakeholders
Option 5: Requirements, deliverables
The tools and techniques used for quality planning include all but:
Option 1: Comprehensive checklists
Option 2: Benefit/cost analysis
Option 3: Flowcharting
Option 4: Benchmarking
Option 5: Design of experiments
_____________ is the overall intentions and direction of an organization with regard to quality, as formally expressed by top management.
Option 1: Top-down reporting
Option 2: Project management procedure
Option 3: Quality policy
Option 4: Quality assurance
Option 5: Quality control
Quality is defined as:
Option 1: The totality of characteristics of an entity that bear on its ability to satisfy stated or implied needs
Option 2: Verifying the customers requirements are met
Option 3: Meeting the project quality checklist without flaws
Option 4: Satisfying the customers' needs within the stakeholders' budget
Option 5: None of the above
An input to the quality assurance process is:
Option 1: Customer satisfaction
Option 2: Quality management plan
Option 3: Product description
Option 4: Standards and regulations
Option 5: Checklists
_____________ is a statistical method that helps identify which factors might influence specific variables.
Option 1: Critical path method
Option 2: Contemporaneous scheduling
Option 3: Design of experiments
Option 4: Benchmarking
Option 5: System flowcharts
_____________ is a structured tool, usually industry- or activity-specific, used to verify that a set of required steps has been performed.
Option 1: Process control model
Option 2: Work breakdown structure
Option 3: Checklist
Option 4: Project plan
Option 5: Operational management plan
Practice Free Quality Management Set 1 Questions online
By Practicing the below question set :
The student will get the basic and advanced knowledge on Quality Management Set 1.
The student will learned the priciples and methedology of Quality Management Set 1.
The student will evaluate the knowledge level on Quality Management Set 1.
Student can practice number of times the question till he is clear.
Student can provide the review / feedback / suggestion on the questions which will help to others.
The question contains the simple to complex level difficulties so that student can improve the knowledge.
Kindly
Note : The information provided here is just indicative
information and is provided on “as is”
and “as available” basis . We make no
claims on accuracy and reliability of the information.
For correct/current information kindly contact concerned
college/institution/authorities